Volvo

FE Electric 27t Municipal

Electric truck · N3 · Updated 2026-08

Volvo FE Electric — purpose-built for Irish councils and waste management operators. Widely used for refuse collection, road sweeping and gully emptying across urban and suburban routes. A 2023 battery upgrade extended range to up to 275km.

Volvo FE Electric 27t Municipal — electric truck Ireland 2026
🔍 Tap to enlarge
€240,581 After SEAI grant
275km WLTP ~215km real-world
275WLTP range km375kWh battery
215Real range kmIrish conditions est.
150Max DC kWFast charging
17.0s0–100 km/hAcceleration
€240,581Net priceAfter grants
€900Motor tax/yr27t GVW rate

⚙️ Technical specifications

Battery capacity375 kWh
WLTP range275 km
Real-world range (Ireland)~215 km
Acceleration (0–100 km/h)17.0s
Top speed90 km/h
Torque2,500 Nm
DrivetrainRWD
Max DC charge rate150 kW
Max AC charge rate22 kW
ConnectorsCCS · Type 2
Cargo volume60,000 L
Max payload15,500 kg
Gross vehicle weight27 t
Seats2
Dimensions
Length8,000 mm
Width2,550 mm
Height3,600 mm
Battery warranty8 years / 800,000 km
CO₂ emissions0 g/km
🏁 WLTP range275km
🇮🇪 Real-world (Irish)~215km

Estimates based on mixed Irish motorway/urban driving. Actual range varies with speed, temperature, load and driving style.

Volvo highlights

🛡️
Volvo Safety
Top Euro NCAP ratings and Volvo's 50-year safety leadership

💰 Irish pricing & incentives

List price (inc. 23% VAT)€295,000
ZEHDV Grant (Dept. of Transport, administered by TII) (Medium enterprise, est.)− €54,419
Net price after grants€240,581

ZEHDV grant by enterprise size (% of the €108,837 price differential vs. the TII baseline diesel truck, €131,000 ex VAT):

Enterprise sizeRateEstimated grant
Small60%€65,302
Medium50%€54,419
Large30%€32,651

Enterprise size follows the EU SME definition (staff headcount plus turnover or balance sheet). Total ZEHDV support is capped at €500,000 per undertaking (including affiliates) per budgetary year. See the full ZEHDV grant guide for eligibility details.

💡 Total savings of €54,419 shown at the Medium-enterprise rate — see the table above for your enterprise size. Always verify eligibility at seai.ie.

ZEHDV Grant (Dept. of Transport, administered by TII) €54,419 Motor tax €900/yr
Estimated annual running costs (100,000km)
Home/depot charging (€0.24/kWh)~€32,727
Public charging (€0.49/kWh avg)~€66,818
Motor tax€900/yr
Saving vs diesel equivalent (€1.65/L)~€16,773/yr
💡 Fuel savings: At €0.24/kWh depot charging rate vs diesel at €1.65/L, annual fuel savings on the FE Electric at 100,000km are typically ~€16,773, based on the estimate above — actual savings vary with route profile and driving conditions.

🚘 FE Electric — All Trims & Pricing Ireland 2026

All prices are guide prices. Private buyer prices shown after ZEHDV Grant (Dept. of Transport, administered by TII) (€54,419). List prices already reflect Ireland's VRT relief for zero-emission vehicles. Confirm current pricing with your authorised dealer.

Model / Trim Battery & Range Price After Grants
FE Electric 19t 4x2
Compact
280kWh · 200km €265,000€210,581
FE Electric 27t 6x2
Municipal
375kWh · 275km €295,000€240,581

Prices include 23% VAT. Net prices shown after ZEHDV Grant (Dept. of Transport, administered by TII) (€54,419). List prices already reflect VRT relief. Always verify at seai.ie.

🇮🇪 FE Electric on Irish routes

Haulage route analysis for typical Irish distribution and logistics operations.

🚛 Dublin Port → Cork depot 260km · M8
⚡ Charge stop recommended
🛤️ Dublin Port → Galway depot 220km · M6
⚡ Charge stop recommended
✈️ Dublin → Shannon Freeport 195km · M7/N18
✅ Single charge — 20km remaining
🔄 Regional depot return 300km · Round trip
⚡ One rapid charge stop needed
🌙 Night linehaul Dublin–Cork 260km · M8 single
⚡ Charge stop recommended
🏙️ Daily urban distribution 100km · /day
✅ Comfortably within daily range

Based on ~215km estimated real-world range. Actual range varies with load, speed and conditions.

👥 Is the FE Electric right for you?

Daily route (<194km)✅ Single charge
Long haul (>215km)⚠️ Rapid charge stop needed
ZEHDV grant eligible✅ €54,419 at Medium-enterprise rate (50%)
Max payload✅ 15,500 kg
GVW class✅ 27t GVW
Depot charging (overnight)✅ 150kW DC recommended
Fleet telematics integration✅ Available
Motor tax€900/yr (27t GVW band)
💡 Best for: Waste, recycling and municipal fleets.

⚡ Charging guide

🏠 7.4kW home wallbox (0–100%)~51h
🏠 11kW three-phase (0–100%)~35h
🏢 22kW AC (0–100%)~18h
⚡ 50kW ESB ecars DC (10–80%)~315min
🚀 150kW DC ultra-fast (10–80%)~105min
Connectors (DC)CCS
Connectors (AC)Type 2
🔌 Irish networks: Compatible with ESB ecars, Ionity, EZO, Circle K and Applegreen via CCS.

Volvo provides charging access via the Volvo app — covering all major Irish networks and integrating charging planning with route navigation.

📐 Dimensions & cargo

Length8,000 mm
Width2,550 mm
Height3,600 mm
Cargo volume60,000 L
Max payload15,500 kg
TowingNot rated
GVW27 tonnes
Seats2
Battery warranty8 years / 800,000 km
🔋 Battery warranty: 8 years / 800,000 km. Manufacturer covers against capacity loss below 70%.

❓ Frequently asked questions — Volvo FE Electric 27t Municipal

The Volvo FE Electric 27t Municipal has an Irish list price of €295,000 (including 23% VAT). After the ZEHDV Grant (Dept. of Transport, administered by TII) of €54,419, the net cost is approximately €240,581. The range starts from €265,000 list price. Confirm current pricing with your authorised dealer and verify grant eligibility at seai.ie.
The Volvo FE Electric 27t Municipal has a WLTP official range of 275km. In real-world Irish conditions — stop-start delivery routes, cold mornings and motorway runs with payload — expect approximately 215km per charge. This suits depot-based daily operations comfortably.
The ZEHDV grant is not a flat figure — it is calculated as a percentage of the price differential between the Volvo FE Electric 27t Municipal and the equivalent diesel truck (TII baseline: €131,000 ex VAT). For this vehicle, that works out to approximately €65,302 for a small enterprise (60%), €54,419 for a medium enterprise (50%), or €32,651 for a large enterprise (30%) of the €108,837 price differential. The ZEHDV scheme is administered by Transport Infrastructure Ireland (TII) on behalf of the Department of Transport — not SEAI. Applications go to: zehdvgrant@pierse.ie. Total ZEHDV support is capped at €500,000 per undertaking (including affiliates) per budgetary year. The vehicle must be new and zero-emission. See our full ZEHDV grant guide for enterprise-size definitions and how the cap works, and contact TII/Pierse Fitzgibbon directly to confirm your figure before ordering.
The Volvo FE Electric 27t Municipal has a maximum payload of 15,500 kg at a GVW of 27 tonnes. This is sufficient for regional rigid body operations — general freight, chilled distribution and construction materials. Note that electric trucks carry a slightly heavier kerb weight than diesel equivalents due to battery mass — always verify the specific variant's VIN plate payload figure. The WLTP range of 275km is tested at 80% of maximum payload.
The Volvo FE Electric 27t Municipal has a WLTP official range of 275km, measured at 80% payload under standardised test conditions. Under real-world Irish conditions — full payload, motorway speeds, varying weather — expect approximately 215km per charge. For route planning, use 172km as a conservative daily operational figure, leaving a 20% buffer. For long-haul routes beyond this, plan a midday rapid charge stop — the Volvo FE Electric 27t Municipal supports up to 150kW DC, adding approximately 100km of range in 23 minutes.
At 100,000km per year: depot charging at €0.24/kWh costs approximately €32,727 in electricity — compared to approximately €49,500 in diesel at €1.65/L for an equivalent truck. Annual fuel saving: approximately €16,773. Add maintenance savings — no diesel particulate filter, no AdBlue, no oil services, fewer brake replacements — typically €3,000–€6,000/year. Most fleet operators reach total cost of ownership parity within 3–4 years once the ZEHDV grant is factored in — see the pricing section above for this vehicle's specific grant range by enterprise size.
The Volvo FE Electric 27t Municipal supports up to 150kW DC and 22kW AC. For overnight depot charging, a 22kW three-phase AC wallbox delivers a full charge in approximately 18 hours — ideal for vehicles returning to base each night. For faster turnaround, a 150kW+ DC charger charges 10–80% in approximately 105 minutes. ESB ecars Business and EasyGo Fleet both provide commercial depot charging solutions in Ireland. SEAI's EV Infrastructure grant can cover up to 75% of installation costs for commercial depots — apply before installation begins.
As a zero-emission vehicle, the Volvo FE Electric 27t Municipal produces no tailpipe CO₂ or NOx — it will not be subject to restrictions in any planned Irish Low Emission Zone. Dublin City Council and Cork City Council are both advancing LEZ plans targeting diesel vehicles in city centre and port areas. The Volvo FE Electric 27t Municipal will have unrestricted access to these zones when implemented. For operators currently running diesel trucks on inner-city routes, transitioning to zero-emission vehicles like the Volvo FE Electric 27t Municipal now — supported by the ZEHDV grant — positions your fleet ahead of compliance requirements.
The Volvo FE Electric 27t Municipal supports up to 150kW DC and 22kW AC charging. At a 7.4kW home wallbox, a full charge takes approximately 51 hours. At a 50kW ESB ecars rapid charger, 10–80% takes around 315 minutes. At the maximum 150kW DC rate, 10–80% takes approximately 105 minutes.
The Volvo FE Electric 27t Municipal uses CCS (DC fast charging) and Type 2 (AC), compatible with all major Irish networks including ESB ecars, Ionity, EZO, Circle K and Applegreen.
Motor tax for the Volvo FE Electric 27t Municipal is €900 per year — the rate for a zero-emission heavy goods vehicle (HGV) in the 27t GVW class. Commercial vehicle motor tax in Ireland is determined by gross vehicle weight (GVW), not CO₂ emissions. You can verify the exact band for your vehicle at motortax.ie.

🔍 Also consider

Same category · similar real-world range · ranked by price.

Interested in the Volvo FE Electric?

Use our free calculators to estimate your fleet running costs, grant savings and total cost of ownership.

🔗 Everything you need alongside the Volvo FE Electric 27t Municipal

Heavy vehicles like the Volvo FE Electric 27t Municipal require DC rapid charging for practical overnight depot turnaround. A 150kW+ DC charger delivers a full charge in a commercially viable timeframe:

🔌
EVBox BusinessLine Managed
Full back-office management — OCPP compliant, remote monitoring
View specs & pricing →
🔌
Kempower T-Series DC Depot rapid
Modular DC rapid charging — scale from 1 to 10 vehicles as your fleet grows
View specs & pricing →
📐 Calculators for the FE Electric
📊
Fleet Grant & TCO Calculator
Calculate total cost of ownership, SEAI grant savings and diesel vs electric fuel cost comparison for the Volvo FE Electric 27t Municipal across your fleet size.
Open fleet calculator →
🏭
Depot Charging Cost Calculator
Model your depot electricity cost for the Volvo FE Electric 27t Municipal — night rate vs day rate, partial charges, multi-vehicle scheduling.
Open calculator →
☀️ Solar panels for your depot or yard — offset charging costs

Solar panels on a depot, warehouse or yard building can offset a significant portion of EV charging costs — reducing grid import and improving fleet TCO. SEAI Non-Domestic Microgen grants and TAMS III (agri) are available. Accelerated Capital Allowance allows year-1 tax write-off.

☀️ Solar Panel Directory → 💶 Solar Cost Calculator →
📋
ZEHDV Grant guide — how to apply for the truck grant
The Zero Emission Heavy Duty Vehicle (ZEHDV) grant is NOT administered by SEAI — applications go to the Department of Transport. Our guide covers eligibility, documentation, how to apply for multiple vehicles in one submission, and common mistakes to avoid.
Read the ZEHDV grant guide →
🔌 All EV chargers → | 🚗 EV directory → | ☀️ Solar panels → | 🌡️ Heat pumps → | 📂 All directories →

📲 Park & Charge: manage EV charging with De Energy Hub

Search for EV charging by location, book a session in advance or scan the QR code on arrival, then check in via the app. Get De Energy Hub free on the App Store or Google Play.

📲 Get De Energy Hub app

Download De Energy Hub to manage EV charging bookings across your sites, or list your own chargers as bookable Hubs.

🍎 Download on theApp Store ▶️ Get it onGoogle Play

Free to download. Search, book and check in, all from your phone.

De Energy Hub
De Energy Hub
More power to you®.
🏭 Built for depots, warehouses & logistics operators

Open your depot to partner fleets — managed EV charging

Truck, van, bus and minibus depots can now open their charging infrastructure to visiting partners and contract fleets. Set your energy rate — charge from your solar at Pure Energy rates, blend with grid on Smart Energy, or run at full grid speed on Boost Energy. Filter bookings by vehicle category — Car, Van, Truck, Bus, Minibus, Campervan — so the right charger is always assigned.

☀️ Pure Energy 🔄 Smart Energy 🚀 Boost Energy
🚛
Filter by vehicle category
Cars, vans, trucks, buses and minibuses each routed to the right charger type — no mismatches
🔗
Partner depot access
Open your depot to visiting partners with managed booking — track every session
📊
kWh & session tracking
Live energy usage, cost per session and cumulative depot totals — all in one dashboard
Explore De Energy Hub → See all app features →